The stone plinth is now complete and looks great. The timber frame at first floor level is also complete and ready to be clad in a standing seam Pigmento Brown Zinc by VMZinc. When walking round the dwelling we now get a feeling of the impressive double height and vaulted spaces with equally impressive views out over the surrounding countryside. M&E first fix is progressing well. Next job is the window installation.
New Build Country House Lancashire
Works are nearing completion to our Country House scheme in Lancashire. The pool tiling is finished with the tiling to the bathrooms and hallways well under way. The internal joinery and cornices are almost fully installed and the beautiful stone staircase is in the process of being fitted. Outside the external works are continuing with garden walls, gateposts and driveway all commencing at the same time.